ev charger tester

Charger Tester for EVSE & Charging Station Testing

Test EV charging stations efficiently with advanced EV simulation, protocol analysis, and real-time measurement — ideal for manufacturers, labs, and field engineers.

  • ev charging tester
  • ev charger testing equipment
  • evse testing equipment
  • ev charging station tester
  • electric vehicle charger tester
  • ev charging point tester
  • ev charging tester
  • ev charger testing equipment
  • evse testing equipment
  • ev charging station tester
  • electric vehicle charger tester
  • ev charging point tester

Product Model: PM701E EVSE Tester

Supported Standards: IEC 61851-1, IEC/HD 60364-7-722

Connector Type: Type 2 (IEC 62196-2) for AC Mode 3 Charging Stations

Input Voltage: Up to 250V (Single-phase) / Up to 430V (Three-phase), 50/60Hz

Max Current: 10A

PP Simulation (Cable): NC, 13A, 20A, 32A, 63A

CP Simulation (Vehicle): States A, B, C, D

Fault Simulation: CP Error “E”, PE Error (Earth Fault)

Measurements: Direct access to L1, L2, L3, N, PE via 4mm safety sockets.

Signal Analysis: CP signal output terminals for oscilloscope connection.

Safety Rating: CAT III 600V, IP54 (Dust & Water Resistant)

Power Output: Integrated mains socket (10A max) for load testing.

Dimensions: 210 x 110 x 55mm (Handle unit only)

Weight: Approx. 938g

What is an EV Charger Tester?

An EV charger tester, also known as an EVSE tester (Electric Vehicle Supply Equipment tester), is a specialized diagnostic instrument used to verify the safety, functionality, and communication protocol of electric vehicle charging stations. Unlike a simple multimeter, a dedicated EV charging station tester simulates the presence of an actual electric vehicle to initiate, monitor, and analyze the charging session.

The PM701E is a professional-grade, handheld EV charger tester designed for Mode 3 AC charging stations. It acts as an intermediary between the charging station and an electric vehicle. By simulating different vehicle states (CP Simulation) and cable capacities (PP Simulation), it forces the charging station to respond, allowing you to measure the output parameters and verify compliance with international standards like IEC 61851. Whether you are commissioning a new installation or troubleshooting a faulty unit, this EV charging diagnostic tool provides the critical data you need to ensure the charger is operating safely and efficiently.

Why is EV Charger Testing Important?

As the adoption of electric vehicles accelerates, the reliability of charging infrastructure becomes paramount. Using a high-quality EV charger testing equipment is not just recommended; it’s essential for several reasons:

1.Safety Assurance: High-voltage AC and DC systems pose significant risks. An EV charger safety tester checks for critical issues like dangerous voltages on the Protective Earth (PE) conductor, which can cause electric shock. The PM701E features a dedicated PE Pre-Test to identify this hazard before you begin.

2.Compliance and Standards: Charging stations must adhere to strict standards like IEC 61851 and ISO 15118. An EV charger compliance tester ensures that the installation meets these regulatory requirements, protecting both the installer and the end-user.

3.Fault Diagnosis: When a charging station fails, the cause can be complex—ranging from a simple wiring error to a failure in the communication protocol. An EV charger fault tester allows technicians to isolate the problem quickly, simulating faults like “CP Error E” or “PE Error” to see how the station reacts, dramatically reducing troubleshooting time.

4.Performance Verification: Is the charging station delivering the power it promises? By using the mains socket on the PM701E to connect a load, technicians can perform a functional test to verify the energy meter and power output, ensuring the station is performing as intended.

5.Preventive Maintenance: Regular testing with an EVSE diagnostic tester can identify potential issues before they cause a station failure, minimizing downtime and ensuring a reliable experience for EV drivers.

Read More

EV Simulation

Go beyond simple measurement. The PM701E accurately simulates an electric vehicle to trigger the charging process. Use the CP State rotary switch to simulate vehicle states A (Not connected), B (Connected, not ready), C (Connected, ready, no ventilation), and D (Connected, ready, ventilation required). This allows you to verify the charging station’s control pilot responses under different conditions.

electric car charger tester
ev charger testing device

CP / PP Signal Testing

Communication is key. The Control Pilot (CP) signal, using Pulse Width Modulation (PWM), dictates the available current. The Proximitor Pilot (PP) signal tells the station the capacity of the connected cable. With this EV charger communication tester, you can simulate cable capacities from 13A to 63A using the PP rotary switch and monitor the resulting CP signal waveform via dedicated safety sockets, ensuring the station’s “brain” is talking correctly.

AC & DC Charger Testing

While primarily designed for AC testing, this EV charging analyzer provides the foundational testing principles applicable to both. The ability to analyze PWM signals, measure voltage, and simulate vehicle states is critical knowledge for technicians working on both AC EV charger testers and preparing for the complexities of DC fast charger testers.

ev charger diagnostic tool
ev charger test system

Charging Protocol Testing

Ensure seamless communication between the EV and EVSE. The PM701E allows you to step through the entire handshake and charging process, verifying that the station correctly transitions through states A, B, and C. This makes it an invaluable EV charger protocol analyzer for validating the logic of the charging session as defined by IEC 61851.

The Charging Standards for EV Charger Tester

The PM701E is engineered to test charging stations designed for a wide range of international and regional standards, making it a versatile asset for any workshop or field service team.

IEC 61851-1: The core international standard for electric vehicle conductive charging systems. The PM701E is built from the ground up to test against this standard, covering everything from basic connectivity to error handling. This makes it the go-to IEC 61851 ev charger tester for professionals worldwide.

IEC/HD 60364-7-722: Essential for low-voltage electrical installations, specifically for EV supply equipment. Use the PM701E to perform the initial verification and periodic testing required by this standard, including protective conductor continuity, insulation resistance, and functional tests.

CCS (Combined Charging System) Ready: While the physical testing of high-voltage DC requires specific loads, the communication protocol for CCS is built upon the AC handshake defined in IEC 61851. As a CCS charger tester, the PM701E is the perfect tool for verifying the crucial AC control pilot and proximity pilot signals that initiate a CCS charging session.

CHAdeMO Context: Similar to CCS, CHAdeMO charging sessions begin with a control signal. Using the PM701E as a chademo charger tester allows for the validation of the initial connection and safety checks performed by the charging station before the high-voltage DC contactors close.

Type 1 & Type 2 (AC): Equipped with a detachable Type 2 test cable, the PM701E is the ideal type 2 ev charger tester for European and many global markets. The fundamental testing principles (CP/PP signals, voltage measurement) also directly apply to type 1 ev charger tester applications with the appropriate adapter, making it a highly flexible tool.

General Specifications Details
Product Name EV Charger Tester / EVSE Analyzer
Model Number PM701E
Standards Compliance IEC/EN 61851-1, IEC/HD 60364-7-722
Measurement Category CAT III 600V
Ingress Protection IP54 (Dust and splash water protected)
Operating Temperature 0°C to 40°C (32°F to 104°F)
Power Supply Powered by the charging station under test
Dimensions (LxWxH) 210 x 110 x 55mm (Unit only)
Weight Approx. 938g (2.07 lbs)

1.Safety First: PE Pre-Test

Action: After firmly connecting the PM701E to the charging station via the Type 2 test cable, touch the PE Pre-Test touch probe with your bare finger.

Purpose: This is a critical safety step. If the red warning indicator lights up, it signifies a dangerous voltage on the Protective Earth (PE) conductor. Immediately stop testing and investigate the station’s wiring. This feature makes the PM701E an indispensable EV charger inspection tool.

2.Configure Simulation Parameters

Action: Before initiating the charge, set the simulation states using the two rotary switches on the device.

PP State Rotary Switch: Select the current capacity of the simulated charging cable (e.g., 32A).

CP State Rotary Switch: Select the desired vehicle state (e.g., State C for “ready to charge”).

Purpose: This configures the PM701E to act as a specific type of EV, allowing you to test how the charging station responds to different vehicles and cables. This is the core function of an EV charger load simulation tester.

3.Initiate and Analyze Communication

Action: With the PM701E connected and configured, the charging station should begin its startup sequence. Use the Phase Indicator LEDs to confirm voltage is present.

Purpose: Observe the charging station’s behavior. Connect an oscilloscope to the dedicated CP Signal Output Terminals to analyze the PWM signal’s duty cycle, amplitude, and frequency. This verifies the station’s communication integrity, acting as a specialized EV charger communication testing tool.

4. Perform Electrical Measurements & Fault Testing

Action:

Connect your installation tester or multimeter to the L1, L2, L3, N, and PE measuring terminals to perform insulation resistance, continuity, and loop impedance tests.

Plug a suitable load (like a water heater) into the Mains Socket to perform a load test and verify the energy meter.

Press the CP Error “E” or PE Error buttons during a charging session to simulate faults and verify the station’s safety shutdown mechanisms.

Purpose: This final step completes the full diagnostic picture, verifying both the electrical safety and the proper handling of error conditions, confirming the station’s reliability.

handheld ev charger tester

What is the difference between an EV charger tester and an EV simulator?

While the terms are often used interchangeably, an EV charger tester (like the PM701E) is a diagnostic tool used by technicians to test the charging station. An EV simulator is typically a more complex and expensive piece of equipment used by manufacturers during the R&D phase to fully emulate an electric vehicle’s battery and communication systems under all possible conditions. The PM701E bridges this gap by offering core simulation functions (vehicle states, cable capacity, faults) in a portable ev charger tester format designed for field and installation use.

What standards should EV charger testers support?

A professional EV charging station tester should support the fundamental safety and communication standards. The most critical is IEC 61851-1, which governs conductive charging systems. For installation testing, support for IEC/HD 60364-7-722 is also essential. For advanced testing, look for tools that can help analyze signals related to ISO 15118 (for PLC-based communication), though a basic tester like the PM701E focuses on the physical layer and core protocol defined in IEC 61851.

Can an EV charger tester simulate an electric vehicle?

Yes, a quality EV charger tester is specifically designed to simulate the presence and state of an electric vehicle to initiate and control a charging session. The PM701E simulates the vehicle by using specific resistances between the Control Pilot (CP) and PE conductors. This allows you to test the charging station’s response in all defined vehicle states (A, B, C, D) without needing an actual car present, making it a powerful ev simulator tester.

Who uses EV charger testers?

A wide range of professionals rely on EV charger testers:

Electrical Contractors and Installers: For commissioning new charging stations and verifying safe, code-compliant installation.

Maintenance Technicians: For troubleshooting faulty public or private charging stations.

Facility Managers: For performing routine safety checks on their EV infrastructure.

EVSE Manufacturers: For quality control, production line testing, and R&D validation.

Inspection Authorities: For certifying that public charging points meet regulatory standards.

Is a portable EV charger tester suitable for field testing?

Absolutely. In fact, portability is a key requirement for field testing. The PM701E is designed as a rugged, handheld ev charger tester with an IP54 rating, making it resistant to the dust, moisture, and impacts commonly encountered in field environments. Its lightweight design and battery-free operation (powered directly by the charging station) make it the perfect companion for on-site diagnostics.

Can EV charger testers help diagnose charging faults?

Yes, this is their primary purpose. An EV charger diagnostic tool like the PM701E helps pinpoint the root cause of failures by systematically testing each part of the charging process. For example, if a station won’t start charging, you can use the tester to check for PE voltage faults, verify the CP signal is present and correct, simulate the vehicle correctly (State B -> C), and test the RCD. The built-in fault simulation (CP Error E, PE Error) also lets you see if the station can correctly detect and react to problems, which is invaluable for comprehensive diagnosis.

How do I test an EV charging station?

Testing an EV charging station involves a series of steps to ensure safety and functionality:

Visual Inspection: Check for physical damage and correct wiring.

Safety Tests: Use an installation tester connected to the PM701E’s measuring terminals to check protective conductor continuity, insulation resistance, and RCD tripping time.

Functional Test: Use an EV charger test system like the PM701E to simulate an EV. Connect it, perform the PE Pre-Test, select the desired vehicle state (e.g., State C), and verify that the station begins to supply power. Use the phase indicators and mains socket to confirm output.

Signal Analysis: Use an oscilloscope on the CP output terminals to check the PWM signal’s duty cycle and voltage levels.

Fault Simulation: Test the station’s safety mechanisms by simulating faults like CP Error “E” to ensure it stops the charging session immediately.

Send Your Inquiry
Quick Quote